Vita Students, Edinburgh

Share project

Located next to Fountain Park in the western part of the city, VITA Edinburgh is a prominent addition to the city offering the highest quality, cutting edge accommodation for the discerning multi-national students who have made Edinburgh their temporary home.

The building provides 250 studio flats of various shapes and sizes, each with en-suite shower room, a kitchen, desk, fitted wardrobes, Wi-Fi and wall-mounted flat screen TV.

The topography of this site varied significantly from east to west and with an existing retaining wall around the southwest boundary. Within the immediate vicinity of the scheme there are restaurants, pubs, offices, retail businesses and accommodation. The west elevation fronts the Edinburgh canal.

The building is arranged in a group of interconnected forms alternating in height from six storeys above ground floor at Fountainbridge, three storeys above ground floor for the middle and southern sections and eight storeys above ground floor for the highest tower element.

The ground floor incorporates lounge areas, private kitchen and dining facilities, study/meeting rooms and a media centre. There is a contemporary feel throughout with a range of high-quality finishes which are simple and elegant.

Complex logistics management was required on this tight city centre site to maintain relationships with a multitude of neighbours. The lightweight, structural framing panel system comprised of pre-fabricated cold rolled steel wall panels and concrete floors. All panels were constructed off-site and delivered on a floor-by-floor basis ready for immediate erection using the project’s two tower cranes. The off-site manufacture ensured a high degree of constructional accuracy and high quality. The frame was installed faster than traditional methods and required a smaller installation team which inevitably provided economical benefits.

Each apartment is fitted with mechanical ventilation and heat recovery units to provide fresh air supply and extract ventilation in each space.

Sector
Student Accommodation
Location
Edinburgh
Client
VITA / Select Group
Architect
Michael Laird
Value
£22m
Completion
November 2018
Statistics

Focused on creating 
a better future through every project

The high-end development provides 496 studio apartments across two connected blocks of 12 and 14-storeys. Communal study, fitness, social areas, courtyard gardens and a 102 cycle storage bays are also included in the scheme.

icon

£4m

Spend of £4m with sub-contractors within the Coventry City Council area

icon

5

Employ five people from NEETS background

icon

2

Provision of two work experience placements for local young people

icon

25%

Employ 25% of workforce from within Coventry City Council area

icon

15

Engagement 15 apprentices

Client feedback
“Our scope of works for this project included the management of design from RIBA Stage 2, partnering with the client to develop this high-quality, bespoke development. We Supported the client to achieve funding for the project and accelerated the pre-construction programme and phased handover strategy to facilitate the arrival of students in September 2022 for the new academic year.”
Alex Reynolds
Area Manager
test alt
Projects

Latest news + insights

View all news + insights

View news story

April 28th, 2026 | 3 min

Bowmer + Kirkland partner with Derbyshire FA to support grassroots football

Bowmer + Kirkland has announced a new sponsorship partnership with Derbyshire County FA, reinforcing its ongoing commitment to supporting local grassroots football across the county.

View news story

April 21st, 2026 | 3 min

Bowmer + Kirkland announces charity partnership with the Teenage Cancer Trust

Bowmer + Kirkland (B+K) has announced that it will be supporting the Teenage Cancer Trust (TCT) as its official charity partner for the next two years, committing to raise vital funds to support young people facing cancer across the UK through a wide range of fundraising initiatives.

View news story

April 21st, 2026 | 3 min

Bowmer + Kirkland tops out at Glenbrook’s latest Leeds development

A topping out ceremony has been held at Glenbrook’s latest build-to-rent scheme, Regency Works in Leeds.

View news story

April 14th, 2026 | 3 min

Bowmer + Kirkland to host UKREiiF Fringe event in Leeds

Bowmer + Kirkland (B+K) will host its first fringe event alongside UK Real Estate Investment & Infrastructure Forum (UKREiiF) in May 2026, inviting clients, investors and industry partners to connect during the UK’s leading real estate and infrastructure gatherings.

View news story

April 1st, 2026 | 3 min

Strengthening safety at height with specialist First Responder training

First aid colleagues across two live Bowmer + Kirkland projects have successfully completed a specialist Tower Crane Emergency First Responder training course, enhancing our teams’ ability to respond to emergencies in some of the most challenging environments on site.